Friday, March 13, 2009

Short Skerts No Panties

AND GOING FORWARD! Module 2

MODULE 2

The coating with cement mortar to give greater strength and impermeability to the wall. Before placing a welded mesh which allows the adhesion of mortar to the adobe wall.



moisture To protect the floor consists of the following layers
- a 10cm layer of said
- a layer of gravel
- a 5cm flooring available on the iron mesh
- the finished floor 10cm thick
Antonio Fermin and
stayed until late
night to give the finish.
Concrete floors ocher finish polishing.

0 comments:

Post a Comment