Everything comes to an end!
With blood, sweat and tears but also joy and teamwork.
positive and negative aspects but always in the mood to move forward and deal with difficulties, because if it was easy would not have been fun!
We show the result of our work, which mostly have learned, and we did it with love, with its flaws and virtues.
A panoramic view of the whole which still remained to paint the multipurpose room.
The perspective from access to the alfalfa in front and hills in the background.
Access to the top through the veneer stone ramp.
A view of the central top area with outdoor furniture and distribution paths represent the branches of a tree. In the background red, module 1 module and green toilets.
Some technical aspects:
- The color white was chosen to give more light both inside and outside the complex. Sockets and nose tongs were painted with different colors to differentiate functional modules.
The process followed was:
- was expected at least 30 days before painting to dry without finishing cement.
- the walls are sanded.
- apply two coats of primer that serves as base prior to painting.
- Fixed the points necessary to paste wall and turned to sand the wall.
- We applied two coats of acrylic resin-based (water resistant and washable)
- The baseboards were painted with oil enamel-mate for his special water resistance.
Retouching sockets module 2.
A photo from inside the room where stands the structure of the trusses.